INTERNAL ADAPTATION WORKS:

Works included:

  • Removal of flooring throughout the flat, including the sub floor.
  • New floorboard was fitted to ensure stable flooring.
beauvior
About2
About2
  • The door to the bathroom and living area was widened for easy wheelchair access.
  • Stud walls had to be deconstructed and new stud walls installed.
  • All previous kitchen cabinets were removed and disposed of. New cabinets chosen by the client were fitted along with splash back tiling.
About2
About2
About2
About2

Bathroom works:

  • All bathroom fittings and tiles were removed and disposed of.
  • New thermostatic shower was installed.
  • The toilet and towel rail replaced.
  • The bathroom was retiled to a height of 170cm.
  • Anti-slip flooring was installed throughout the bathroom area.
About2
About2
About2
About2

Bedroom:

  • Removal and disposal of fitted wardrobes and flooring.
  • All walls and ceilings were made good.
  • Redecoration works to all walls, ceilings and woodwork.