Case study De Beauvoir
Home
/
Case Studies
/ Case study De Beauvoir
INTERNAL ADAPTATION WORKS:
Works included:
Removal of flooring throughout the flat, including the sub floor.
New floorboard was fitted to ensure stable flooring.
The door to the bathroom and living area was widened for easy wheelchair access.
Stud walls had to be deconstructed and new stud walls installed.
All previous kitchen cabinets were removed and disposed of. New cabinets chosen by the client were fitted along with splash back tiling.
Bathroom works:
All bathroom fittings and tiles were removed and disposed of.
New thermostatic shower was installed.
The toilet and towel rail replaced.
The bathroom was retiled to a height of 170cm.
Anti-slip flooring was installed throughout the bathroom area.
Bedroom:
Removal and disposal of fitted wardrobes and flooring.
All walls and ceilings were made good.
Redecoration works to all walls, ceilings and woodwork.