info@kabaku-gs.co.uk
Address
Studio 2, 80 Daws Lane, NW7 4SL
Call Us
0746 084 3734,
0777 629 0027
0208 202 9571
4477 7629 0027
home
About Us
Gallery
Services
Case Studies
Contact Us
Camden High Street case study
Home
/
Case Studies
/ Camden High Street case study
INTERNAL WORKS
GROUND FLOOR AND STAIRCASE
Works comprised of:
Repair and redecoration of the ceiling
Fixing of new ceiling where required with 12.5 mm fire line plasterboards
Installation of slate boards where required
Painting of existing slate boards
Staircase covering in front by creating a partition wall separating it from the ground floor completely
Insulation of the partitions and covering with fire proof plasterboard
Installation of support columns under the landing and covering them with fire resistant plasterboard and paint
Covering of the staircase by creating a partition wall separating it from the ground floor
Fire door installation
Repair and redecoration of entire walls, ceilings and balustrade
BASEMENT WORKS:
Removed all flooring and slat boards
Installed blinding course, damp proof membrane and insulation
Insulation of existing walls and dry lining board
Installation of fire line 12.5mm plasterboards
Fixed 25mm batons to existing walls
Fitted new slat boards, balustrade and base rails in the staircase
Redecoration of the ceiling and walls
Installation of wood effect laminate flooring
Creation of a partition as per plan at the back to create a stock room
Fire door installation with fire resistant ironmongery and door closer
search